MNZT for electrical storage assets

Hello,
I am working with storage assets in ENET. I found parameters to define the Minimum down time or Minimum Zero Time (MZT), but not for minimum up time.
Is it possible to define Minimum Non-Zero Time for both charge and discharge?
Thank you!

2 Likes

Thanks for your question Eugenie! It is possible to model Minimum Non-Zero Time for storage objects. In SAInt, we refer to these properties as MinUpTimeD (for charging) and MinUpTimeG (for discharging). You can define them from the Property Editor in the GUI. You can even change their values over the optimization horizon with the help of events.

You can read more in our documentation. These specific properties can be found under the event-default and event-value tabs of the Electric storage (ESTR) section.

3 Likes